Humanoids on production lines and intralogistics in factories. The most detailed public record is Figure 02 at BMW Group Plant Spartanburg: an 11-month deployment, on 10-hour shifts Monday to Friday, in which it loaded sheet-metal parts onto a welding fixture on an active assembly line. Figure reports more than 1,250 operating hours, more than 90,000 parts loaded and a contribution to more than 30,000 BMW X3 vehicles. Apptronik's Apollo is in a commercial pilot agreement with Mercedes-Benz, and UBTECH began mass production and delivery of the Walker S2 in November 2025, reporting orders above 800 million yuan.
Typical requirements: Line-paced precision and uptime. Figure's stated targets for the BMW sheet-metal task were an 84-second total cycle (37 seconds of it for loading), more than 99% successful placements per shift, parts placed within 5 mm, and no human pauses or resets per shift. Figure ran the task as a pick-and-place step feeding six-axis industrial welding robots.
Key limitations: Figure published targets for cycle time, placement accuracy and interventions, not the figures achieved. It reports that the forearm was Figure 02's top hardware failure point, and for Figure 03 it removed the forearm distribution board and dynamic cabling. Apptronik states the terms of individual Apollo engagements are not disclosed.
Ranked by fit






Sources
OBSERVED 2026-11-02
Agent-assisted research · not human-verified
OBSERVED 2026-11-02
Agent-assisted research · not human-verified
OBSERVED 2026-11-02
Agent-assisted research · not human-verified
Supports: description, key limitations
OBSERVED 2026-11-02
Agent-assisted research · not human-verified
Supports: description
OBSERVED 2026-11-02
Agent-assisted research · not human-verified






